Project / LEEDv5 Ready documentation for specifiers

Complete PVC electrical systems, ready for the counter.

Conduit, fittings, boxes, ENT, and accessories organized for fast product selection, straightforward quoting, and real-time technical support.

Distributor Quick List 6 Systems
01Rigid PVC Conduit½–8 in.
02Elbows & FittingsFull range
03Boxes & EnclosuresMultiple formats
04ENT Systems½–2½ in.
05DB2 Utility Duct2–6 in.
06AccessoriesSystem matched
Project / LEEDv5 Ready

Help customers move sustainable projects forward.

Certicon organizes product specifications, standards references, and supporting information for faster review by contractors, consultants, and project teams working to LEED v5 and other project sustainability requirements.

Sell with contextConnect product selection to the customer’s project requirements.
Support submittalsKeep technical references and product details easy to share.
Respond fasterGive project teams a clearer path from question to documentation.

LEED and LEED v5 certification applies to buildings and projects, not to individual products. “Project / LEEDv5 Ready” describes the documentation and product information Certicon provides to support a project review; product contribution depends on the project, credit strategy, and supporting documentation.

Delivery & lead times

Every quote carries a lead time and a ship date.

Lead time decides the job. Certicon confirms availability, production status, and a committed ship date in writing before an order is released — and reports any change to that date the moment it happens.

Lane 01

Stocked fittings & boxes

Elbows, sweeps, couplings, adapters, conduit bodies, boxes, and ENT components are the stocking core of the line. Quantities are quoted against confirmed inventory and released from the nearest stocking point.

Quoted with a confirmed release date
Lane 02

Conduit & DB2 duct

Rigid conduit and utility duct move as special order or full-container programs. The production window, sailing schedule, and expected arrival are confirmed before the order is accepted.

Quoted with a production and arrival window
Lane 03

Project & staged releases

Project quantities are reserved and released against the construction schedule, phase by phase, so material lands when the crew needs it instead of sitting on site.

Quoted with a release schedule by phase
  • Lead time in writingQuotes and order acknowledgements state the lead time and the ship date it is based on — not a verbal estimate.
  • Early warning on changesIf a production or transit date moves, you hear it from Certicon before your customer hears it from the jobsite.
  • Quoted to your dateSend the required-on-site date with the request and the quote is built to that date, including partial and staged shipments.

Need a date on a specific size or quantity?

Ask for a Lead Time Build a Quote
01

Turn a contractor takeoff into a clean quote list.

Upload or paste a material list. Quote Builder organizes the line items, matches product families, flags questions, and creates a distributor-ready request.

Technical questions should not hold up the counter.

Get product matching, size guidance, standards references, and installation information while the customer is still in front of you.

Explore Technical Answers
Q
Distributor counter
Which 2-inch elbow matches Schedule 40 rigid PVC?
A
Technical Answers
Use the 2-inch 90° rigid PVC elbow family. I can also add the matching coupling and open the relevant spec sheet.
Product match ready

Can’t find the exact product?

Send the size, application, quantity, and target date. The product team reviews sourcing and line-extension requests.

Request a Product